KitLog pro

Powered By Kitlog Pro v2.0

Buck's RV-8
' style=
Date:  6-13-2010
Number of Hours:  5.50
Manual Reference:  
Brief Description:  Elec system redesign and switch panel mods

Over the past couple of days, I have managed to eliminate a couple of switches from the main switch panel, which will also allow me to simplify the panel layout and the electrical system itself. The EIS power switch has been eliminated entirely. I also moved the nav lights switch to the main instrument panel. This necessitated several other changes to the panel, which led to more diagram changes... you know how it goes.

The EIS will be controlled with the same switch as the EFIS/AHRS units. It barely uses any current, so it will be OK to add to the Essential Bus.

Redesigning the electrical system is somewhat tedious work, but I actually enjoy most of it. Thinking things through at this final stage before wiring the airplane will pay dividends later.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.