Powered By Kitlog Pro v2.0
Buck's RV-8
RV-8
Shop
9-30-2006
< Previous Log Entry
Next Log Entry >
Date:
9-30-2006
Number of Hours:
0.00
Manual Reference:
Brief Description:
Sealed and insulated hangar
(3.0 hours) Installed weatherstripping around large, folding hangar door. Stripped and painted around old walk-in door. Measured both walk-in doors for insulation. Installed secondary power junction box.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
735
1415
Avionics/Electrical
84
171
Canopy
7
14
Design Philosophies
2
Empennage
124
216
Fiberglass
28
57
Fuselage
298
656
Miscellaneous
4
8
Planning/Studying
29
25
Shop
30
1
Tools
4
Wing-L
56
109
Wing-R
44
80
Wings-Misc
25
78
Copyright © 2001-2024 Matronics. All Rights Reserved.