KitLog pro

Powered By Kitlog Pro v2.0

Buck's RV-8
' style=
Date:  9-30-2006
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Sealed and insulated hangar

(3.0 hours) Installed weatherstripping around large, folding hangar door. Stripped and painted around old walk-in door. Measured both walk-in doors for insulation. Installed secondary power junction box.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.