KitLog pro

Powered By Kitlog Pro v2.0

Buck's RV-8
< Previous Log Entry          Next Log Entry >
' style=
Date:  10-31-2013
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Shop prep/cleanup; toolbox assembly

After nearly two and a half years of distractions, career aggravations, and general foot-dragging, I am finally getting back to my beloved RV-8 project. I spent some time organizing the shop, cleaning, and setting up a second Craftsman rolling toolbox to replace the 20-year old "Husky"-brand boxes that I've been using. The Husky's drawers have gotten very sticky and annoying. Even after I lubed the sliders, it was still tough to open some of them because of the years of accumulated gunk in the bearings. So, after an expensive visit to Sears, I'm almost back in business... As time allows, I will painstakingly clean the sliders in the old toolbox by soaking them in GooGone or some other product.
' style=

Old Red is being retired (or at least pulled out of service for a thorough cleaning!)

Old Red is being retired (or at least pulled out of service for a thorough cleaning!)

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.