KitLog pro

Powered By Kitlog Pro v2.0

Buck's RV-8
' style=
Date:  3-15-2007
Number of Hours:  2.10
Manual Reference:  
Brief Description:  Wing wiring

Fastened wingtip wiring bundle to end rib with two Adel clamps. Connected wires for landing light and nav lights. Attached ground side of each circuit to end rib with bolt/washer/nut. Soldered pitot heat wires to connector. Labeled all wires.
' style=

Wires were routed along the rib with Adel clamps.

Wires were routed along the rib with Adel clamps.

' style=

The first of two 14 AWG wires for the pitot heat has been soldered and covered with heat-shrink tube.

The first of two 14 AWG wires for the pitot heat has been soldered and covered with heat-shrink tube.

' style=

The finished pitot heat connector.

The finished pitot heat connector.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.