Powered By Kitlog Pro v2.0
Bob's Web Site
S-20 Raven
Covering
12-1-2015
< Previous Log Entry
Next Log Entry >
Date:
12-1-2015
Number of Hours:
6.50
Manual Reference:
Brief Description:
Covering Right wing continued
Finished the covering of the top of the right wing. the patch over the fuel cap and its cover ring. Then all the tapes were put on and ironed.
Started the bottom of the wing. Taped the strips onto the ribs, Burnt holes into the ribs for the rivets. then riveted all in place. 153 rivets.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-20 Raven Home
Category
# Logs
# Hours
All
328
1363
Avionics
1
0
Avionics Panel
40
203
Covering
52
264
Empennage
11
28
Engine
15
63
Fuel Trailer
2
8
Fuselage
89
336
Miscellaneous
21
74
Painting
40
160
Prop
2
7
Rans S-20 Kit
4
6
Shop Supplies
1
2
Tools
1
2
Wings
49
210
Copyright © 2001-2024 Matronics. All Rights Reserved.