Exchanged 1/4 turn studs on the bottom cowling for Butterfly winged 1/4 turn studs. Also, exchanged the one on the Oil Access Door Panel.
Completed the install of the Flap Lever cover and surrounding smaller panels.
Installed Control Stick Closeouts including the vents for our heater hoses. Routed hoses back to the Heater core underneath the Forward Baggage compartment floor. Routed Hoses to the 2 back vents in the Fwd Baggage Compartment side walls.
Started the installation of the Baggage Compartment