Brief Description: Rudder system install and others
Worked on the Rudder system install from the firewall back to Station 2A. Manufactured bushings. Bolted Pulleys in place.
Worked on the Flap lever install some more. The holes in the Flap Lever Side Plate were drilled incorrectly. Had to call the factory to find a solution. We had to drill more holes to replace the others
Packed up the Rotax 912 ULS Engine we have that got dropped in shipment. California Power Systems is having it returned to them and they will bench check it. Hopefully it will check out ok and will soon be returned to us.