KitLog pro

Powered By Kitlog Pro v2.0

Bob's Web Site
' style=
Date:  8-5-2016
Number of Hours:  5.50
Manual Reference:  Text manual 01G-02
Brief Description:  Rudder system install and others

Worked on the Rudder system install from the firewall back to Station 2A. Manufactured bushings. Bolted Pulleys in place.

Worked on the Flap lever install some more. The holes in the Flap Lever Side Plate were drilled incorrectly. Had to call the factory to find a solution. We had to drill more holes to replace the others

Packed up the Rotax 912 ULS Engine we have that got dropped in shipment. California Power Systems is having it returned to them and they will bench check it. Hopefully it will check out ok and will soon be returned to us.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.