KitLog pro

Powered By Kitlog Pro v2.0

Bob's Web Site
' style=
Date:  6-3-2015
Number of Hours:  5.00
Manual Reference:  Text Manual 01I-01
Brief Description:  Aft Baggage Compartment

Continued fitting the Aft Baggage Compartment into the Fuselage. Manufactured the support angles as per manual. The floor of the compartment was too wide and needed to be trimmed down about a 1/4' on each side and tapered back to the aft of the floor. The top corners of the compartment needed to be trimmed to maintain a clearance between the sheet metal and the steel tubing. The compartmant comes with a pre-drilled hole in the top center of back wall which needs to cleo'd in place with the corresponding tab on the fuselage. Then you begin fitting the back and then sides to match the fuselage tubes. This installation process takes great deal of time.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.