Brief Description: Worked on getting the shop ready for covering the
Re-arranged shop so we could start covering the wings. Started to take down our make shift paint shop. Did an inspection of the Right wing. Then wiped it down with Stewart System heavy duty cleaner. Read up on how to cover wings. Made a couple calls to Dan at Stewart Systems for some questions. Call Mark Pringle @ RMK, our dealer for a question. Glued the wing for the top cover to be applied first. Cut the Fabric to size for the wing. it gives us about 10 inches by 13 feet of extra fabric that is on each wing. This would of been nice to know intially so we could of used it for patches and etc. Rans tells you to just cut it to length.