Final sanding of interior bonding areas. Brush on epoxy on bonding areas. Wet out and place parabeam. Apply cabosil thickened epoxy on bonding areas. Cleco together door halves. Cleco / clamp door halves to fuselage for curing.
Fabricated fuel vent lines. Measured for tunnel fuel lines - flexible. 6.5" from fuel filter to valve. 14.5" from firewall fitting to boost pump output.