Powered By Kitlog Pro v2.0
Bill's RV-14A Project
RV-14A
All
6-16-2014
< Previous Log Entry
Next Log Entry >
Date:
6-16-2014
Number of Hours:
1.00
Manual Reference:
9-21
Brief Description:
Elevator Assembly Part 4
Right Elevator Inboard Closeout:
I riveted the right root rib to the right elevator top and bottom skins.
I riveted a few remaining holes in the aft skins that were left open in a previous step.
Right Elevator Nearing Completion
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-14A Home
Category
# Logs
# Hours
All
157
273
Emp-Elevator
32
58
Emp-Hor.Stabilizer
18
34
Emp-Rudder
23
48
Emp-Vert.Stabilizer
20
22
Empennage
7
12
Fuse-Aft Fuselage
25
31
Registration
2
Shop-C-Frame Table
3
4
Shop-EAA Workbench
6
9
Shop-Parts/Easel
4
21
Shop-Spray Booth
4
9
Shop-Spray Table
2
4
Shop-Storage Shelves
2
9
Wings
9
12
Copyright © 2001-2024 Matronics. All Rights Reserved.