Brief Description: Baggage Floors, tunnel cover, side covers, seat
Ran rudder cables and installed grommets so I can install sidw covers in baggage compartment. Installed nutplates for baggage floor and tunnel cover. Deburred F747 baggage floors, and riveted them in. Screwed in baggage bulkheads. Forgot to install 4 nutplates previously near wear blocks for shoulder harness cables so did that as well. Installed baggage tunnel cover. Trimmed F749 side covers per plans and deburrred. Installed nutplates on F749's and then fianlly riveted them in. Began installing hinges on left F742. Cut all to size, located them appropriately and drilled holes. Deburred everything and then riveted hinges onto left F742.