Brief Description: F-915 rib and mated aft and center sections
Had a big night. First I finished the F-915 rib on the right side by fluting and drilling into place. Placed aft fuselageg back on saw horses and installed longerons after trimming the slots at the rear where they go on the F711 bulkhead. I then mated up the aft fuselage with the center section and clecoed together per the plans. Attached side skins with clecoes and called it a night. Very exciting to have these pieces together for the first time.