Ran and secured more wires including battery wires. Noted that wire bundle in keel appeared to have a possibility of interfereing with main gear cylinder rod. Removed adel clamps in that area and resecured with tie wraps to tuck the bundle tight into the corner of the keel. Wayne did more wire terminations including BNC and TNC connections on coax cable.