KitLog pro

Powered By Kitlog Pro v2.0

Brookes Web Site
' style=
Date:  2-17-2011
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Secure starter cables

Routed and secured #2 starter wire to airframe and engine using multiple adel clamps. When connecting positive lead to starter, the connecting nut would not tighten. It simply spun on the stud. Had to cut nut off. Noted thread under nut completely stripped. A replacement starter will be comming from Western Skyways next week.

Reattached mixture cable to engine bracket
' style=

Stuck nut

Stuck nut

' style=

Stripped stud

Stripped stud

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.