Ran wireing bundles (built by Wayne Lanza) from panel, through canard bulkhead, down CP tunnel. Some wireing broke out on cold side of firewall. Others continued through to the hot side. Also ran GRT supplied EIS harness from cold side of firewall to hot side.
Continued work on trim motor. Mounted such that trim is effective from 1 5/8 " elevator up to 2 7/8" elevator down (nose up).