Brief Description: Control balance, fuel s/o valves, etc
Cleaned up elevator installation for smooth operation to facilitate balancing. When elevator is upside down, hanging from the hinges, the trailing edge drooped a little. Weight needs to be added to the counter balance arms.
Used structural epoxy to mount aluminum anchors for wireing in strake tip.
Installed fuel shutoff service valves in the lines exiting each main tank.
Completed fuel vent system by installing the tube from manifold out bottom of fuselage. Installed poly drain pipe from overhead plenum out of bottom of fuselage.