KitLog pro

Powered By Kitlog Pro v2.0

Brookes Web Site
' style=
Date:  1-11-2011
Number of Hours:  6.00
Manual Reference:  12.3.1
Brief Description:  Install engine control cables

Spent 2 hours with Wayne Lanza discussing electrical/wireing harness and components and placement.

Cut holes in tunnels and ran the prop, throttle, mixture, and CP throttle cables through respective tunnels
' style=

Throttle, Prop, Mixture

Throttle, Prop, Mixture

' style=

Pilot side cables to tunnel

Pilot side cables to tunnel

' style=

Copilot throttle

Copilot throttle

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.