KitLog pro

Powered By Kitlog Pro v2.0

Brookes Web Site
' style=
Date:  10-10-2009
Number of Hours:  1.00
Manual Reference:  12.3.6
Brief Description:  Glass in Oil cooler Nose NACA scoop

Glassed 2 BID around outside of Oil cooler NACA scoop. Also dug out 1/8 in of foam from fuselage on leading edge of inlet and filled with cabo/micro baloon. When dried, I sanded it off for sharp edges. At this point, I intend to leave it unglassed.
' style=

2357 Looking forward through NACA duct

2357 Looking forward through NACA duct

' style=

2358 Note micro left side of forward duct opening

2358 Note micro left side of forward duct opening

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.