KitLog pro

Powered By Kitlog Pro v2.0

Brookes Web Site
' style=
Date:  6-13-2011
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Canard, Elevator push tube, prepare for weight

Mike Snyder reinspected gear, rudder pedals, and brakes and found everything satisfactory. Reinstalled canard and associated wireing. Attached elevator push tube to elevator linkage. Installed baggage area, rear seats, cooling plenum, and cowling in preparation for weighing.

For first time EVER......all the parts are on the plane at the same time!
' style=

Attaching push tube to elevator linkage

Attaching push tube to elevator linkage

' style=

Rear installed

Rear installed

' style=

Plenum and cowl installed

Plenum and cowl installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.