Finished pitot line to gear control. Cut and installed tubing for avionics cooling. Reinstalled hydraulic tubing from gear hydraulic pump. Secured battery. Secured wireing of Garmin GPS, GRT GPS, and WX antennae. Coiled wires under mounting bracket. Started work to balance elevators.