KitLog pro

Powered By Kitlog Pro v2.0

Brookes Web Site
' style=
Date:  2-22-2011
Number of Hours:  7.50
Manual Reference:  
Brief Description:  Wireing

Ran pilot side magnetometer harness. Installed Strake tiedowns. Ran fuel receptical bonding leads back forward through shear web and then between fuel bulkhead and spar to the tiedowns. Also ran weres from inside firewall grounding posts to tiedowns. This grounds the fuel recepticals to the airplane and also provides a way (via the tiedowns) to ground the airplane and fuel recepticals to the fueling truck.

Installed Zaon.

Rearanged com panel wires such they will not interfere with aileron bell crank mechanism in keel.

Started running antennae coax through strake tunnel, down CP side wireing bundle, through keel to the panel
' style=

Pilot side Magnetometer

Pilot side Magnetometer

' style=

Tiedown installed

Tiedown installed

' style=

Zaon installed on canard

Zaon installed on canard

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.