Fabricated and installed all aluminum and flex lines. Upon checking clearances with gear mechanism I noted 2 places of interference with the lines on the pilot side. The aluminum tubing will have to move outboard to allow room for the over center linkage to reach almost to the floor. The pilot side bulkhead fitting will have to be moved about 1/4 in outboard to preclude interference with the bolt head of the shock and gear leg connection.