Trimmed pilot side cabo pads for spider and drilled holes in spider and pads so that bolt head was perpendicular to outside surface of gear door. Installed nut plates with 5 min epoxy and pop rivets. Layed up CP spider with 11 bid carbon. Made tabs for gear leg and attached to legs using 2 bid.