Brief Description: Install fuel caps, more bulkheads
Installed both right and left fuel cap flanges with bonding wire attached. Imbeded bonding wire in strake with cabo covered with 2 bid. Fabricated more copilot bulkheads. Dug out foam for fuel strainer well on copilot side