KitLog pro

Powered By Kitlog Pro v2.0

Brookes Web Site
' style=
Date:  12-7-2009
Number of Hours:  5.00
Manual Reference:  12.3.6
Brief Description:  Install Oil cooler duct and fresh air scoop

Dug out blue foam around oil cooler exit hole and hole for air scoop. Filled with cabo/flox and installed duct and scoop. One layer of bid inside fuselage around each. Put radius of micro around oil cooler exit.
' style=

Edge readied for cabo

Edge readied for cabo

' style=

Ducts glassed in

Ducts glassed in

' style=

Fresh air scoop (front), Oil cooler exit (aft)

Fresh air scoop (front), Oil cooler exit (aft)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.