KitLog pro

Powered By Kitlog Pro v2.0

Brookes Web Site
' style=
Date:  10-6-2009
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Install Gear Contol system

Install hard points into fuselage wall. Plans said to use 5 min epoxy, but I had a hard time with that setting up too fast. After several tries, I was able to use it to set the hard points in place sufficiently to remove the gold box. I then filled in the hard point cavity with micro and cabo and glassed over with 2 BID and peel ply. Let cure overnight and installed gold box. It looks nice!
' style=

2355 Hard points

2355 Hard points

' style=

2356

2356

' style=

2357  Installed!

2357 Installed!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.