KitLog pro

Powered By Kitlog Pro v2.0

Brians Web Site
' style=
Date:  5-3-2020
Number of Hours:  3.00
Manual Reference:  25
Brief Description:  Forward Center Section Bulkhead assembly

Riveted 40 AN470 rivets joining the side angle to the bulkhead. Used the rivet gun and tungsten bucking bar. Set at 60PSI. Riveted all ribs to spar, and attached bolts with appropriate torgque. I used the small, non digital, torque wrench to make sure the AN3 bolts were torqued to 28in pounds as per the directions. Torque seal was applied.
' style=

Left side

Left side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.