Powered By Kitlog Pro v2.0
Bruce & Kathy's RV-7A
RV 7A
VERTICAL STAB
7-8-2006
< Previous Log Entry
Next Log Entry >
Date:
7-8-2006
Number of Hours:
2.00
Manual Reference:
Brief Description:
Assembled VS
Assembled VS and drilled all holes to 40. Also drilled holes in the bottom 410 for the Delrin Rudder stop.and cut the blue plastic with the Radio Shack butane solder iron. That thing works 100% better than the corded solder iron.
Not too many parts to the VS
Drilled skin holes to 40
Then everything else to 30
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV 7A Home
Category
# Logs
# Hours
All
909
2354
Empannage
13
49
FIBERGLASS
29
40
FINISH KIT
282
897
FLYING
5
3
FLYING
11
6
FUSELAGE
131
406
HANGAR
18
58
HORIZONTAL STAB
31
54
LEFT ELEVATOR
26
37
MISC
22
11
Miscellaneous
22
11
PAINTING
38
116
PANEL
4
5
PARTS- AIRPLANE
3
0
POLISHING
18
46
PRIMING
17
64
RIGHT ELEVATOR
19
25
RUDDER
31
63
Shop
20
4
SHOP SUPPLIES
1
0
TOOLS
8
TRIM TAB
4
5
VERTICAL STAB
14
23
WINGS
142
431
Copyright © 2001-2024 Matronics. All Rights Reserved.