Powered By Kitlog Pro v2.0
Mikes Web Site
RV8
Fuselage
1-20-2007
< Previous Log Entry
Next Log Entry >
Date:
1-20-2007
Number of Hours:
1.00
Manual Reference:
Brief Description:
elevator bell crank
deburred, drilled and riveted the bell crank. Installed same with hardware callout in fuse... An4 torqued to 60 inch pds. As you can tell, there is some overspray on the bottom of the fuse skin, this will eventually be covered by insulation.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV8 Home
Category
# Logs
# Hours
All
90
258
Empennage
35
86
Fuselage
32
104
Miscellaneous
14
47
Tools
1
1
Wings
8
20
Copyright © 2001-2024 Matronics. All Rights Reserved.