Powered By Kitlog Pro v2.0
Mikes Web Site
RV8
All
8-24-2006
< Previous Log Entry
Next Log Entry >
Date:
8-24-2006
Number of Hours:
3.75
Manual Reference:
Brief Description:
elevators
prepared skins, primed insides of skins. cut all of the stiffners for both elevators. clecoed the stiffners to both skins and drilled them out, as per plans (including PP 615). disassembled.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV8 Home
Category
# Logs
# Hours
All
90
258
Empennage
35
86
Fuselage
32
104
Miscellaneous
14
47
Tools
1
1
Wings
8
20
Copyright © 2001-2024 Matronics. All Rights Reserved.