KitLog pro

Powered By Kitlog Pro v2.0

Pauls Web Site
' style=
Date:  6-7-2015
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Right fiberglass gear fairing installed

I epoxied on the right fiberglass gear fairing over my carbon fiber layup. I mixed the epoxy with microballons for a filler. I wetted the inside of the fairing and the outside of the gear leg and installed the fiberglass fairing. I ran two strings around the fairing back to the rear hooks that I installed in the previous step. I twisted the fairing so that the trailing edges (top and bottom) was in the middle of the strings. This assured that the fairing is inline with the aircraft. I used metal clips to hold the trailing edge together. When I do the left side I will not use the fast setting epoxy. This takes longer that one would think. Had to work fast.
' style=

Front view of right gear leg

Front view of right gear leg

' style=

Trailing edge between the strings

Trailing edge between the strings

' style=

Rear view of right gear leg

Rear view of right gear leg

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.