KitLog pro

Powered By Kitlog Pro v2.0

Pauls Web Site
' style=
Date:  3-17-2019
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Installing fuselage access door

Worked on installing the fuselage access door above the avionics. Fabricated backer and spacer from carbon fiber, bedded them in with micro/epoxy mixture, and riveted. Next step will be to install the door. I have it ready and rough trimmed.
' style=

Creating backing plate

Creating backing plate

' style=

Laying out rivet line

Laying out rivet line

' style=

All riveted in

All riveted in

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.