2-2-2015
< Previous Log Entry
Next Log Entry >
Date:
2-2-2015
Number of Hours:
3.50
Manual Reference:
Brief Description:
Riveting the H/S
Final riveting came after making sure the stab was in line between the left and right sides.
One side done
Finished!
Another finished part to store!