Powered By Kitlog Pro v2.0
N750MC Construction Log
CH-750
Wings
9-13-2009
< Previous Log Entry
Next Log Entry >
Date:
9-13-2009
Number of Hours:
6.00
Manual Reference:
Brief Description:
Wing work continues
The outboard flaperon was built. Both the inboard and outboard flaperons for the left wing are now complete. Still waiting for the wing tips and slat tips which are backordered. Total construction time now at 338 hours.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH-750 Home
Category
# Logs
# Hours
All
74
341
Aircraft Kit
2
Elevator
7
22
Fuselage
38
201
Horizontal stab
3
20
Rudder
3
15
Wings
17
83
Workbench
4
Copyright © 2001-2024 Matronics. All Rights Reserved.