KitLog pro

Powered By Kitlog Pro v2.0

N750MC Construction Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  8-2-2009
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Wing work began

Began work on left wing. Nose rib ā€˜Lā€™ angle flanges were fitted and riveted to the four nose ribs and slat brackets. The center and nose ribs were clecoed to the spar, drilled to final size and re-clecoed to the spar. The root rib was fitted and clecoed in place. Total construction time now at 263 hours.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.