Began work on left wing. Nose rib āLā angle flanges were fitted and riveted to the four nose ribs and slat brackets. The center and nose ribs were clecoed to the spar, drilled to final size and re-clecoed to the spar. The root rib was fitted and clecoed in place. Total construction time now at 263 hours.