Made progress on the elevator spar center section. This task was accomplished by drilling a few holes at a time while the assembly was clamped to the flat work surface and flipping the elevator over several times until all holes were drilled to the final #20 size. All holes are now drilled and the elevator left and right sides are aligned as they should be.