Date:
5-14-2009
Number of Hours:
4.00
Manual Reference:
Brief Description:
Elevator completed
Elevator riveting was completed. Elevator was mated to the horizontal stabilizer while inverted on a level surface. The elevator and horizontal stabilizer are now ready for final assembly on the fuselage.
Riveting complete
Elevator attached to stabilizer
Ready for final assembly