Powered By Kitlog Pro v2.0
N750MC Construction Log
CH-750
All
5-5-2009
< Previous Log Entry
Next Log Entry >
Date:
5-5-2009
Number of Hours:
3.00
Manual Reference:
Brief Description:
Elevator work continues
Leading edge skins were fitted the elevator. During the task, the elevator was flipped over several times and clamped to the flat work surface to maintain the alignment between the left and right side of the elevator.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH-750 Home
Category
# Logs
# Hours
All
74
341
Aircraft Kit
2
Elevator
7
22
Fuselage
38
201
Horizontal stab
3
20
Rudder
3
15
Wings
17
83
Workbench
4
Copyright © 2001-2024 Matronics. All Rights Reserved.