KitLog pro

Powered By Kitlog Pro v2.0

N750MC Construction Log
' style=
Date:  5-3-2009
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Elevator work began

Work on the elevator began. Ribs were clecoed to the spar and rear skins clecoed to the elevator skeleton using the existing #40 pilot holes provided by Zenith. At this point the elevator had a significant warp and clamping it down to a perfectly flat surface resulted in skin buckling. Something had to be done. Work ended for the day.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.