Brief Description: Install Electrical System Controls/Switches
6. Install Electrical System Controls/Switches
Wiring harnesses
co-pilot side - 3" back from chicken blocks. Mark 15" below water line, run from vertical chikcen block mark up 57" forward, then diagonal down to 8" above floorboard forward to firewall
strip & rough up wire clips rough up clib locations, mark w/ wax pencil clean with alcohol glue clips in line with cable run ~30 clips, 25 minutes to set
run cable from ceiling run down side of plane to clip line forward & also into sub flooring. tie wrap, ensuring no kinks.
Need hole through aft bulkhead - drilled 1.75" hole.
break for lunch
TCAS upper & lower, co-ax Pklot side - intercom/ommunications.