KitLog pro

Powered By Kitlog Pro v2.0

BILL'S WEB SITE
' style=
Date:  9-26-2007
Number of Hours:  6.00
Manual Reference:  8.2
Brief Description:  Install Brackets and Fittings/Chicken Blocks

7. Install Brackets and Fittings-chicken blocks

Rear pressure bulkhead chicken blocks, mark pressure bulkhead with jig installed
once bulkhead is out measure 117" from forward line. This is the center line for the chicken blocks.
Set chicken block (CB) - chicken block on the edge of core, mark the center hole, then I measure 3" on center. 20 CB per half fuselage

Spar Box - from top flange hold CB at top.
Place anotehr just below and mark the center. This is one row of CB. For aft CB mark 3/4" from flange for centers.

For top CBs measure distance (of cener) (39) and deivide by 3 to get the number of CB

Firewall - From joggle measuer 2.3" aft for center of CB. From center of fuselage 6" on center for both sides

100 grams of 9394 hysol for metal to carbon bonding

Holes are drilled with #16 bit and counter sunk to be flush
' style=

Non-pressurized bulkhead

Non-pressurized bulkhead

' style=

On sparbox

On sparbox

' style=

Interior firewall

Interior firewall

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.