KitLog pro

Powered By Kitlog Pro v2.0

Bretts Web Site
' style=
Date:  10-22-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Instrument panel

Temporarily installed the instrument panel and drilled the monting holes out. I have decided to use a 10" Dynon with an Ipad mini as a backup. Started trying to lay everything out on the panel, put the panel back on, and checked to see if everything felt like it was in a good spot. I decided to move a few things around and I think I have evrything close to the way I think it will work best. I also ordered the flush mount for the Ipad, the air vents, and a glovebox
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.