Powered By Kitlog Pro v2.0
Bretts Web Site
SS7
All
4-30-2019
< Previous Log Entry
Next Log Entry >
Date:
4-30-2019
Number of Hours:
2.00
Manual Reference:
Brief Description:
Oratex
Tried installing the turtle deck in one piece and just could not get it to work right. I called Lars and he said it was probably not possible to do this so I decided to go with two pieces instead of one. Layed out and preped those pieces.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
SS7 Home
Category
# Logs
# Hours
All
391
972
Avionics
41
91
Empennage
40
120
Fuselage
155
361
Miscellaneous
26
64
Wings
129
336
Copyright © 2001-2024 Matronics. All Rights Reserved.