KitLog pro

Powered By Kitlog Pro v2.0

Bruce's Sonerai IILS Site
' style=
Date:  12-13-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  side 2

fabricate and tack weld uprights at STA 29.5 and 83, install diagonals between same stations
bend bottom longeron at front and rear
fabricate and tack weld upright at STA 0
fabricate and install diagonal between STA 0 and STA 29.5
drill oil holes in tubes at all joints
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.