Powered By Kitlog Pro v2.0
Bruce's Sonerai IILS Site
IILS
All
12-11-2013
< Previous Log Entry
Next Log Entry >
Date:
12-11-2013
Number of Hours:
2.50
Manual Reference:
Brief Description:
side 1 fabrication
Added final upright at STA 172 and diaganol , tack welded
added cross member at STA 83
tacked temporary upright between top and bottom longeron at tail post location
drill oil holes in tubes at all joints
removed from jig table
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
IILS Home
Category
# Logs
# Hours
All
26
52
Fuselage
26
52
Copyright © 2001-2024 Matronics. All Rights Reserved.