KitLog pro

Powered By Kitlog Pro v2.0

BARRY'S WEB SITE
< Previous Log Entry          Next Log Entry >
' style=
Date:  8-22-2004
Number of Hours:  11.00
Manual Reference:  Chapter 4, Section C
Brief Description:  Cowling Installation

Fabricated upper cowling attack angle. Fitted and trimmed upper and lower cowlings. Installed lower cowling hard points with 1/4 turn fastners. Installed hardpoint and threaded insert fastners inside fuselage for screws to hold lower cowling to fuslage. Drilled both upper and lower cowlings for fastners. Located and cut out oil door from upper cowling. Fabricated oil door flange and installed to upper cowling. Installed hinges to both door and upper cowling. Installed latch hardware to oil door.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.