KitLog pro

Powered By Kitlog Pro v2.0

BARRY'S WEB SITE
' style=
Date:  6-1-2003
Number of Hours:  8.50
Manual Reference:  Chapter 2, Section R
Brief Description:  Center Console Fab and Installation

Fabricated bearing bulkheads and installed bulkheads and bearings to the right side of the console. Core crushed and filled the edges of all the panels. Attached the left side of the console. Installed the console to the fuselage. Reinforced the seat belt hard points with layers of glass.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.