Debured, primered, and riveted the slat brackets to nose ribs. #4 slat bracket had additional hole in the wrong place and was remade by match drilling to ensure there isn't a problem. Also riveted the angles to the fuel tank channel but not to the ribs to allow for the fuel tank to be installed first.