Final fitting of cowl with oil cooler in place. Creative use of "swim noodle" allowed positioning of oil cooler during cowl installation helped quite a bit. Increased area of heat exchanger interface to ensure rubber seal had adequate surface for seating. Added RTV and tie wraps where hoses/control lines might rub against each other.